§ 14-8-6. Schedule for collection.
Generators or the authorized party for a premises generating construction or demolition waste shall enter into a written agreement with a permitted hauler for collection, according to the following schedule:
1.
City municipal collections division:
A.
Shall collect all accumulations of construction or demolition waste in one (1) roll-off for each property that generates construction or demolition waste in quantities less than eight (8) cubic yards every two (2) weeks;
B.
Shall provide a sufficient quantity of roll-offs as to ensure that construction or demolition waste does not become a nuisance or overfill roll-offs; and
C.
Collection of each roll-off at least once every fourteen (14) calendar days.
2.
Self-transporters and/or permitted haulers:
A.
All accumulation/storage of construction or demolition waste in quantities equal to or greater than eight (8) cubic yards and which cannot be placed in a roll-off container shall be collected every two (2) weeks by self-transporters or permitted haulers;
B.
All accumulation/storage of construction or demolition waste must be collected at least once every fourteen (14) days.
(Ord. No. 2012-06, § 1, 3-6-2012)